COSTECH Integrated Repository

Alternative Process Flow for Underground Mining Operations: Analysis of Conceptual Transport Methods Using Discrete Event Simulation

Show simple item record

dc.creator Greberg, Jenny
dc.creator Salama, Abubakary Juma
dc.creator Gustafson, Anna
dc.creator Skawina, Bartłomiej
dc.date 2016-07-12T13:46:20Z
dc.date 2016-07-12T13:46:20Z
dc.date 2016-06-30
dc.identifier Greberg, J., Salama, A., Gustafson, A., & Skawina, B. (2016). Alternative Process Flow for Underground Mining Operations: Analysis of Conceptual Transport Methods Using Discrete Event Simulation. Minerals, 6(3), 65. http://dx.doi.org/10.3390/min6030065
dc.identifier 2075-163X
dc.identifier http://hdl.handle.net/20.500.11810/3143
dc.identifier 10.3390/min6030065
dc.description As the near surface deposits are being mined out, underground mines will increasingly operate at greater depths. This will increase the challenges related to transporting materials from deeper levels to the surface. For many years, the ore and waste transportation from most deep underground mines has depended on some or all of the following: truck haulage, conveyor belts, shafts, rails, and ore pass systems. In sub-level caving, and where ore passes are used, trains operating on the main lower level transport the ore from ore passes to a crusher, for subsequent hoisting to the surface through the shaft system. In many mines, the use of the ore pass system has led to several problems related to the ore pass availability, causing production disturbances and incurred cost and time for ore pass rehabilitation. These production disturbances have an impact on the mining activities since they increase the operational costs, and lower the mine throughput. A continued dependency on rock mass transportation using ore passes will generate high capital costs for various supporting structures such as rail tracks, shaft extensions, and crushers for every new main level. This study was conducted at an existing underground mine and analyzed the transport of ore from loading areas at the lower levels up to the existing shaft points using trucks without employing ore passes. The results show that, when the costs of extending ore passes to lower levels become too great or ore passes cannot be used for production, haul trucks can be a feasible alternative method for transport of ore and waste up the ramp to the existing crusher located at the previous main level. The use of trucks will avoid installing infrastructure at the next main level and extending the ore passes to lower levels, hence reducing costs.
dc.language en
dc.publisher MDPI AG, Basel, Switzerland
dc.subject Rock mass transportation
dc.subject Haulage system
dc.subject Trucks
dc.subject ore pass
dc.subject Discrete event simulation
dc.subject Sub-level caving
dc.title Alternative Process Flow for Underground Mining Operations: Analysis of Conceptual Transport Methods Using Discrete Event Simulation
dc.type Journal Article, Peer Reviewed


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search COSTECH


Advanced Search

Browse

My Account