BOD5 Removal in Facultative Ponds: Experience in Tanzania

dc.creatorMayo, Aloyce W.
dc.date2016-05-24T13:29:10Z
dc.date2016-05-24T13:29:10Z
dc.date1996
dc.date.accessioned2018-03-27T08:40:57Z
dc.date.available2018-03-27T08:40:57Z
dc.descriptionFull Text can be accessed at http://www.sciencedirect.com/science/article/pii/S027312239600827X
dc.descriptionThis paper discusses the removal of BOD5 in facultative ponds under tropical conditions. Data was collected from pilot and field ponds at the University of Dar es Salaam and was compared to other ponds in Dar es Salaam. Results showed deviations of performance, in some cases, from assumptions made during the design. The permissible organic loading rate for ponds in Dar es Salaam was 450 kg BOD5/ha/d. To reduce concentration of algae in the final effluent, a sunken outlet structure was suggested.
dc.identifierMayo, A.W., 1996. BOD 5 removal in facultative ponds: experience in Tanzania. Water Science and Technology, 34(11), pp.107-117.
dc.identifierhttp://hdl.handle.net/20.500.11810/2235
dc.identifier10.1016/S0273-1223(96)00827-X
dc.identifier.urihttp://hdl.handle.net/20.500.11810/2235
dc.languageen
dc.subjectFacultative ponds
dc.subjectBOD5 removal rate
dc.subjectBOD5 design equations
dc.subjectTropical climates
dc.titleBOD5 Removal in Facultative Ponds: Experience in Tanzania
dc.typeJournal Article, Peer Reviewed

Files